CMU RETAINING WALLS

LEMONT RESIDENTIAL HOME 2013

This project was completed in 2013. It involved the demolition of an old timber wall & the installation of a cmu retaining wall. Along with the installation of a drain tile behind the wall. The walls were built based on an engineering firm’s drawings.

ASHTON PARK CMU RETAINING WALL 2012

This job was completed in 2012, and it was part of a much larger drainage project. It involved extending an existing cmu retaining wall to prevent soil from eroding into the drain tile.